EcoSmart ECO-11 Servisní příručka Strana 4

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 19
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 3
Service Manual 1000677 EcoSmart PB10 1000678 EcoSmart hiDeck 221110.doc Page 4 of 19
3. BASIC INSTRUCTIONS:
3.1. INSTALLATION DETAILS:
Electrical installation:
Electrical specification: 2.8kW-230V-50Hz
A moulded 13A plug is factory fitted. A suitable 13A outlet is all that is required.
Plumbing installation procedure:
Mains water pressure required (limits): 5-50psi (35-345kPa)
Fit a stop Valve on a cold water line and attach a 3/4" BSP male fitting,
(e.g. 3/4" x 1/2" 311 or washing machine type stop valve).
Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached
sealing washer is fitted.
Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow
several gallons through.
Connect right-angled tailpiece of the hose to the inlet valve of the boiler (again 3/4" BSP).
Make sure the sealing washer is fitted here also.
Turn on water and check for leaks.
Operating boiler for the first time:
Check that all installation procedures have been carried out.
Ensure water valve is on.
Plug boiler into 13A socket and press power button on the front of the machine marked
„Power‟. Refer to Figure 1.
The “power on” light will glow green and the machine will fill to a safe level, above the
elements, before heating. The display will show the current water temperature and the status “
Filling…”
The “Ready/Status” light will cycle two red flashes while the machine is filling to the safe level.
After this amount of water has heated to about 96ºC the boiler will draw more water in until the
temperature drops by 1 or 2 degrees. The boiler will then heat again. This heat fill cycle
continues until the boiler is full.
While filling, the “Ready/Status” light will remain blank.
The “Ready/Status” light will glow green when the machine is both full and up to normal
operating temperature. For 10L machines allow approx 30 minutes.
The boiler is now ready for use the display will show the Water Temperature and the status “
READY”.
The Boiler may now be used to dispense Hot Water to the preset factory settings.
o 94‟C
o Push and Hold operation
o Continuous flow no pulsing
o Auto heat Fill Mode.
Zobrazit stránku 3
1 2 3 4 5 6 7 8 9 ... 18 19

Komentáře k této Příručce

Žádné komentáře